C-TS4CO-2020 Study Guide Brilliant C-TS4CO-2020 Exam Dumps PDF [Q58-Q80]

Share

C-TS4CO-2020 Study Guide Brilliant C-TS4CO-2020 Exam Dumps PDF

View C-TS4CO-2020 Exam Question Dumps With Latest Demo

NEW QUESTION 58
Which of the following values can be calculated using results analysis? 3 answers

  • A. Cost of goods manufactured
  • B. Cost of sales
  • C. Work in progress
  • D. Gross margin
  • E. Reserves for unrealized costs

Answer: B,C,E

 

NEW QUESTION 59
Which scenarios can be covered by the costing run?

  • A. Inventory cost estimate of all the materials in one plant
  • B. Standard cost estimate of all the materials in all plants of a controlling area
  • C. Current cost estimate of all the materials in all controlling areas
  • D. Product cost collector cost estimate in one plant

Answer: B,C

 

NEW QUESTION 60
You want to define requirement levels for users for the authorization check in Profitability Analysis reporting. Which requirement level would you set to enable user access to all the interactive drill down functions?

  • A. 0 - ALL
  • B. 1 - Level 1
  • C. 2 - Level 2
  • D. 3 - ALL

Answer: A

 

NEW QUESTION 61
How does SAP S/4HANA capture costs? Note: There are 2 correct answers to this question.

  • A. Only primary costs are captured in general ledger accounts.
  • B. All primary and secondary costs are captured by creating them as cost elements.
  • C. Secondary costs are captured as secondary cost element, and not as general ledger accounts.
  • D. Primary and secondary costs are captured in general ledger accounts.

Answer: B,D

 

NEW QUESTION 62
What are the benefits of using valuated sales order stock compared to non-valuated sales order stock?
There are TWO correct answers for this question

  • A. Simplified inventory value determination
  • B. Combined quantity and value flow analysis
  • C. Production order settlement to sales order
  • D. Production cost calculation

Answer: A,B

 

NEW QUESTION 63
You want to setup integrated planning for your internal order. What do you need to do? Note: There are 2 correct answers to this question.

  • A. Set the relevant indicator in the internal order master record.
  • B. Set the relevant indicators in the CO version.
  • C. Set the relevant indicator in the controlling area.
  • D. Set the relevant indicator in the planning profile of the order type.

Answer: A,B

 

NEW QUESTION 64
Which of the following steps are part of the procedure to update the standard price of the material? Note: There are 2 correct answers to this question.

  • A. Split the costs.
  • B. Mark the cost estimate.
  • C. Release the cost estimate.
  • D. Archive the cost estimates.

Answer: B,C

 

NEW QUESTION 65
Which object do you have to assign the cost component structure to?

  • A. Valuation variant
  • B. Costing type
  • C. Material master record
  • D. Costing variant

Answer: D

 

NEW QUESTION 66
How can you define the overhead rate in a costing sheet? Note: There are 2 correct answers to this question.

  • A. As percentage rate
  • B. As quantity-based surcharge
  • C. As equivalence number
  • D. As lot-based surcharge

Answer: A,B

 

NEW QUESTION 67
What do you do to create a primary cost component split? There are TWO correct answers for this question

  • A. Use the cost splitting tool on cost centers
  • B. Assign a cost component structure to the CO-version
  • C. Run an activity price calculation
  • D. Enter split activity prices manually

Answer: B,C

 

NEW QUESTION 68
Which of the following statements best describe Product Cost by Order? Note: There are 2 correct answers to this question.

  • A. It is recommended for products with a long production time.
  • B. It is used when full cost traceability is needed.
  • C. It is used when controlling by individual production lots or discrete quantities is needed.
  • D. It is used when you perform repetitive manufacturing.

Answer: B,C

 

NEW QUESTION 69
How can you populate local variables in Profitability Analysis reports?

  • A. By user exit
  • B. By populating from user parameters
  • C. By business Add-in
  • D. By user entry during report execution

Answer: D

 

NEW QUESTION 70
You define rules in a status profile and assign the profile to your internal order type. What do you use the status profile for? Note: There are 3 correct answers to this question.

  • A. To define the user status
  • B. To set the initial status as Created or Released
  • C. To permit or forbid specific transactions
  • D. To define users for the order
  • E. To activate the CO partner update

Answer: A,B,C

 

NEW QUESTION 71
Which default values can you configure for the product cost collector? Note: There are 2 correct answers to this question.

  • A. Costing variant for preliminary costing
  • B. Result Analysis (RA) Version
  • C. Result Analysis (RA) key
  • D. Variance variant

Answer: A,C

 

NEW QUESTION 72
Which field can you select for both reporting in costing based and account-based Profitability Analysis?

  • A. Version
  • B. Value in Controlling Area Currency
  • C. Cost element
  • D. Record type

Answer: A

 

NEW QUESTION 73
Your customer defined one distribution cycle in SAP S/4HANA.
You need to define a new distribution cycle. How can you ensure the new cycle is executed only after the existing one is completed?

  • A. Select iteration in the cycle header of the new cycle
  • B. Assign both cycles to the same cycle run group
  • C. Select iteration in the cycle header of both cycles
  • D. Assign each cycle to a different cycle run group

Answer: B

 

NEW QUESTION 74
Which configuration is possible when you assign multiple company codes to a controlling area in SAP S/4HANA ?

  • A. The company code operational chart of accounts may differ from the controlling area operational chart of accounts
  • B. The company code fiscal year variant may differ fro the controlling area fiscal year variant in the number of periods
  • C. The company code fiscal year variant may differ fro the controlling area fiscal year variant in the number of periods and number of special periods
  • D. The company code currency may differ from the controlling area currency

Answer: D

 

NEW QUESTION 75
You are posting a purchase order for a warehouse material. From which object is the profit center derived?
Response:

  • A. Cost center
  • B. Material master
  • C. Plant
  • D. Business partner

Answer: B

 

NEW QUESTION 76
When you create a planning layout, whih objects can you use to define the data columns ? 3 Answers

  • A. Value fields
  • B. Summarization level
  • C. Formulas
  • D. Distribution key
  • E. Characteristics

Answer: A,C,E

 

NEW QUESTION 77
How does the system derive the requirement type from the material master data ?

  • A. MRP group -> strategy group -> planning strategy -> requirements type
  • B. Strategy group -> planning strategy -> requirements type
  • C. MRP group requirements class -> planning strategy -> requirements type
  • D. Strategy group -> planning strategy -> requirements class -> requirements type

Answer: A,B

 

NEW QUESTION 78
Which parameters can you enter when you create a costing run? There are THREE correct answers for this question

  • A. Transfer control
  • B. Costing version
  • C. Valuation variant
  • D. Production version
  • E. Costing variant

Answer: B,C,E

 

NEW QUESTION 79
Which scenarios can be covered by one single costing run? Note: There are 2 correct answers to this question.

  • A. Current cost estimate of all the materials in all controlling area
  • B. Product cost collector cost estimate in one plant
  • C. Inventory cost estimate of all the materials in one plant
  • D. Standard cost estimate of all the materials in all plants of a controlling area

Answer: B,C

 

NEW QUESTION 80
......


SAP C-TS4CO-2020 Exam Syllabus Topics:

TopicDetails
Topic 1
  • Determine and configure product cost planning, define interface from CO-PCP (Product Cost Planning) to CO-PA (Profitability Analysis)
Topic 2
  • Define WIP, results analysis, variances and revenue recognition
  • Determine cost elements structure, cost component structure
Topic 3
  • Define, create and configure cost centers, cost center hierarchies and cost center groups
  • Organizational Assignments and Process Integration
Topic 4
  • Design process flows and develop authorization concept for reporting of FI
  • CO data
  • create Profit Centers and check master data assignments, and configure period-end closing for PCA
Topic 5
  • Define currency and assign the chart of accounts, result analysis
  • Determine general reporting requirements for cost centers, configure cost center reporting
Topic 6
  • Determine and configure cost object controlling - planning and actuals, and customize
  • Configure profitability analysis and determine the operating concern
Topic 7
  • Determine usage of Cost Center Accounting and type of planning functionality
  • Create organizational charts for profit centers, determine Profit Centers (in FI in the new GL)
Topic 8
  • Define, create and configure internal orders and create a concept for internal order accounting
  • costing variants and multi-level costings, and carry out a Price update in the material master record
Topic 9
  • Determine planning, actual and process flow and security requirements
  • Distinguish between order category and order type. Determine plan data


SAP S/4HANA Management Accounting Certification Exam Details:

Reference BooksTS4F03 (SAP S/4HANA 2020)
TS4F04 (SAP S/4HANA 2020)
TS4F03 (SAP S/4HANA 1909)
TS4F04 (SAP S/4HANA 1909)
Passing ScoreC_TS4CO_2020 - 64%
C_TS4CO_1900 - 63%
Number of Questions80
Exam Price$550 (USD)
LevelAssociate
Schedule ExamSAP Training
Sample QuestionsSAP S/4HANA Management Accounting Certification Sample Questions

 

Free C-TS4CO-2020 Test Questions Real Practice Test Questions: https://www.dumpsreview.com/C-TS4CO-2020-exam-dumps-review.html

C-TS4CO-2020 Dumps Updated Aug 19, 2022 WIith 256 Questions: https://drive.google.com/open?id=1PtS71Z-lb-AeEG_uiE09SsGEa6Tl6Vh-