NEW QUESTION 11
What steps are possible in a PP/DS production planning run?
There are 3 correct answers to this question.
Response:
- A. Heuristics
- B. Optimization
- C. Detailed scheduling functions
- D. Backorder processing
- E. Demand consumption
Answer: A,B,C
NEW QUESTION 12
Your customer complains about incorrect duration for production order operations. What time elements could cause the issue?
There are 3 correct answers to this question.
Response:
- A. Processing time
- B. Tear down time
- C. Floating time
- D. Move time
- E. Queue time
Answer: C,D,E
NEW QUESTION 13
The pegging situation was changed because of an MRP heuristic run. What is a capability of dynamic pegging?
Response:
- A. It propagates changed sales order priorities to the pegged planned orders
- B. It enables the propagation of network alerts across the bill of materials structure
- C. It links receipts from an alternative location in case of a shortage in the default location
- D. It replaces fixed pegging relationships unless they have been created for stock
Answer: C
NEW QUESTION 14
Where can you maintain consumption mode and consumption periods for planning strategies?
There are 2 correct answers to this question.
Response:
- A. In the requirements class
- B. In the plant parameters
- C. In the material master
- D. In the MRP group
Answer: C,D
NEW QUESTION 15
A resource was created in SAP S/4HANA PP/DS through the internal CIF integration and named
"W1904_1000_001". What does the suffix 001 in the resource name represent?
Please choose the correct answer.
Response:
- A. Capacity category
- B. Available capacity version
- C. Work center category
- D. Number of individual capacities
Answer: A
NEW QUESTION 16
What is the purpose of collective orders?
- A. To post any component withdrawals single back flush with order confirmation
- B. To manage production orders for an entire finished product on multiple levels
- C. To combine order management of co-products and by-products with the main product
- D. To post production costs on a cost collector instead of the production order
Answer: B
NEW QUESTION 17
You want to set up a make-to-order planning scenario for a finished material. Some components from the bill of materials (BOM) should be procured per sales order, other components should be procured for various requirements. Fore casting is NOT possible. Which settings do you make to achieve this?
- A. Planning strategy 50 (Planning without final assembly) and the corresponding Mixed MRP indicator
- B. Planning strategy 20 (Make-to-Order) and the corresponding individual Collective indicator
- C. Planning strategy 20 (Make-to-Order) and the corresponding Mixed MRP indicator
- D. Planning strategy 50 (Planning without final assembly) and the corresponding individual Collective Indicator.
Answer: D
NEW QUESTION 18
How can you enhance the system statuses of a production order scenario with user statuses?
Please choose the correct answer.
Response:
- A. By activating the user statuses in status and action management
- B. By enhancing the system status customizing table with user statuses
- C. By creating a user profile and assigning it to the production scheduling profile
- D. By defining a status profile and assigning it to the order type
Answer: B
NEW QUESTION 19
You want to perform capacity availability checks on your production orders. What must be set for this to occur? Note: There are 2 correct answers to this question.
- A. Checking control must have an overall profile assigned in customizing.
- B. Checking rule and group must be assigned.
- C. Indicator Relevant for finite scheduling must be set.
- D. PRT Availability check must be set.
Answer: A,C
NEW QUESTION 20
In the Manage Shortage view of the new SAP Fiori app "Monitor Material Coverage", what do the stars indicate?
Please choose the correct answer.
Response:
- A. The viability of the proposed solution
- B. The presence of firmed planned orders
Visit us athttp://examcertify.com/C_TS422_1909.html - C. The priority of the proposed solution
- D. The presence of production orders
Answer: A
NEW QUESTION 21
A customer is considering switching from order-related settlement to product-related settlement. What are capabilities of cost collectors?
There are 2 correct answers to this question.
Response:
- A. They can be applied to make-to-stock production order.
- B. They can be used for manufacturing with collective orders.
- C. They can be used for repetitive manufacturing.
- D. They can be created automatically during month end process.
Answer: A,C
NEW QUESTION 22
What are some uses for the low-level code assigned to each material? Note: There are 2 correct answers to this question.
- A. It is used by product costing to determine how costs are rolled up.
- B. It is used in MRP to determine the sequence in which materials are planned.
- C. It is used by engineering to identify sub items in an engineering bill of material(BOM).
- D. It is used by ATP to determine the priority of alternative components.
Answer: A,B
NEW QUESTION 23
Which of the following is an advantage of MRP Live and NOT available in classical MRP?
Response:
- A. MRP Live can propose alternative solutions
- B. MRP Live can create production orders automatically
- C. MRP Live can priorities demand from sales orders
- D. MRP Live can plan materials with recursive BOMs
Answer: A
NEW QUESTION 24
Which time elements are relevant for lead t me scheduling of a product on order? Note: There are 2 correct answers to this question.
- A. Float after production
- B. Planned delivery time
- C. Setup time
- D. Total replenishment lead time
Answer: A,B
NEW QUESTION 25
What does it mean for the production planner when MRP works with infinite capacities?
- A. MRP creates capacity requirements only if the work center has sufficient capacity.
- B. MRP assigns capacity requirements automatically after the last scheduled order on a work center.
- C. MRP assigns capacity requirements automatically to work center is with the earliest available capacity.
- D. MRP creates capacity requirements without checking the capacity of a work center.
Answer: D
NEW QUESTION 26
Which time elements does MRP consider in backward scheduling to determine the order dates for components from dependent requirements? Note: There are 2 correct answers to this question.
- A. In-house production time
- B. Planned delivery time
- C. Total replenishment lead time
- D. Operation duration
Answer: A,B
NEW QUESTION 27
Why would you use phantom assemblies? Note: There are 3 correct answers to this question.
- A. To make the assignment of components easier
- B. To simplify the structure of bills of material
- C. To reduce the number of material masters
- D. To increase the number of planning levels
- E. To reduce the number of changes required in bills of material
Answer: A,B,E
NEW QUESTION 28
Your project team decides to use a make-to-order planning strategy for a strategic material in discrete manufacturing. What is the impact of this decision? Note: There are 3 correct answers to this question.
- A. Production orders are created with sales order reference.
- B. Sales order-specific stock is created
- C. Sales order-specific planning run is required.
- D. Storage location MRP areas are required.
- E. Net requirements calculation is sales order-specific.
Answer: A,B,E
NEW QUESTION 29
At the end of the MRP run you receive the exception message "Reschedule In Operation". What caused the message to be generated?
Please choose the correct answer.
Response:
- A. The requirements date occurs before that of a firmed planned receipt
- B. The requirements date occurs that of a firmed planned receipt
- C. The requirement no longer exists
- D. A firmed planned receipt cannot be rescheduled
Answer: A
NEW QUESTION 30
How can SAP S/4HANA support a GMP compliant production process? Note: There are 3 correct answers to this question.
- A. Predefined GMP compliant process order types to meet audit requirements
- B. Documentation of quality data with Quality Management
- C. Recipe approval (with Engineering Change Management)
- D. Use of the digital signature function to check and run business processes
- E. Use of the GMP compliant flag in relevant master data applications
Answer: B,C,D
NEW QUESTION 31
Which of the following business processes are controlled by parameters that are dependent on production order type? Note: There are 2 correct answers to this question.
- A. Engineering change management
- B. Planning
- C. Implementation
- D. Inspection during production
Answer: B,C
NEW QUESTION 32
You have a scheduling agreement with a vendor. You want classic MRP to automatically create schedule lines in case of material shortage. What must you do? Note: There are 2 correct answers to this question.
- A. Add the agreement to the source list and mark it for MRP relevance.
- B. Set the creation indicator for delivery schedule lines on the initial screen of the MRP run.
- C. Add the agreement to the quota arrangement and mark it for MRP relevance.
- D. Set the creation indicator for purchase requisitions on the initial screen of the MRP run.
Answer: A,B
NEW QUESTION 33
If the stock level drops below the reorder stock in reorder point planning, what is the system logic to trigger procurement?
- A. Fill up to the reorder stock level
- B. Fill up to the safety stock level
- C. Fill up based on the lot size procedure
- D. Fill up to the maximum stock level
Answer: C
NEW QUESTION 34
Before a user can add multiple production versions in a material master, what information should be collected?
There are 3 correct answers to this question.
Response:
- A. Work center hierarchy
- B. Lot sizes
- C. BOM status
- D. Validity dates
- E. Task list group number
Answer: B,C,D
NEW QUESTION 35
......