SAP C-TSCM42-67 Certification Exam Topics:
| Topic Areas | Topic Details, Courses, Books |
|---|---|
| Application Overview and Background < 8% | Characterize the interplay of master data, planning, ATP, and production functionality. |
| Lean Manufacturing (PP-REM, PP-KAB) 8% - 12% | Outline the highlights of repetitive manufacturing and kanban. |
| Production Orders Advanced (PP-SFC) > 12% | Configure production order functionality. |
| Master Data (LDM) 8% - 12% | Set up master data for production planning and manufacturing. |
NEW QUESTION 45
When analyzing the SAP ECC order report for a planned order for a finished product, you discover that one of the assemblies will not be available in time for the scheduled final assembly because of automatic forward scheduling.
Which planning procedure do you use to create a feasible production plan from a requirements planning perspective?
- A. Total planning online
- B. Interactive single-item planning for the delayed assembly
- C. Multi-level single-item planning with the "display material list" option
- D. Multi-level single-item planning with the "simulation mode" option
Answer: D
NEW QUESTION 46
Which activities lead to a reduction of the capacity requirements for an operation? (Choose three)
- A. Posting the goods receipt for the production order
- B. Rescheduling the operation
- C. Reducing the order quantity
- D. Confirming the operation
- E. Setting the status technically complete (TECO)
Answer: C,D,E
NEW QUESTION 47
You want to produce a finished product only when it is requested by a customer order in make-to-order production. However, all assemblies need to be procured beforehand.
How can you fulfill these requirements in SAP ECC? (Choose two)
- A. Use strategy 50 (planning without final assembly) for the finished product and no strategy for all assemblies in the bill of material.
- B. Use strategy 20 (make-to-order production) for the finished product and strategy 70 (planning at the assembly level) for all assemblies in the bill of material.
- C. Use strategy 40 (planning with final assembly) for the finished product and strategy 70 (planning at the assembly level) for all assemblies in the bill of material.
- D. Use strategy 30 (production by lots) for the finished product and strategy 70 (planning at the assembly level) for all assemblies in the bill of material.
Answer: A,B
NEW QUESTION 48
The company you advise wants to control the availability check in so that when a production and/or process order is created, the following receipts or issues are taken into account: planned orders, purchase orders, production orders, reservations, dependent requirements. When the production and/or process order is released, only the stock that is currently freely usable should be taken into consideration. How can you fulfill this request?
- A. Differentiated assignment of two different checking rules in check control.
- B. Enter an appropriate availability checking rule in the order type.
- C. Activate the freely usable stock in the scope of check.
- D. Enter an appropriate availability checking group in the material master.
Answer: A
NEW QUESTION 49
What could be a consequence of confirming an operation?
- A. The capacity requirements are updated
- B. The production order is rescheduled
- C. The planned costs are updated
- D. The actual costs are settled
Answer: A
NEW QUESTION 50
Which objects can affect the calculation of capacity requirements for an operation? (Choose three)
- A. Operation control key (routing)
- B. Standard values (routing)
- C. Transport time (routing)
- D. Formulas (work center)
- E. In-house production time (material master)
Answer: A,B,D
NEW QUESTION 51
In the Customizing for requirements planning, a project team notices that the alternatives P1, P2, P3 and P4 are also delivered as standard in addition to MRP type PD. The number in each of these alternatives represents a firming type.
What does a firming type define? (Choose two)
- A. Handling new procurement proposals that need to be created due to new requirements within the planning time fence.
- B. Handling existing procurement proposals within a planning time fence.
- C. Handling new requirements within the planning time fence.
- D. Handling existing procurement proposals outside the planning time fence.
Answer: A,B
NEW QUESTION 52
Which of the following scheduling types can only be used in capacity planning?
- A. Only capacity requirements
- B. Midpoint
- C. Forward
- D. Backward
Answer: B
NEW QUESTION 53
Which of the following properties about the planning functions available in SAP ECC applies?
- A. In demand management (DM) material shortage situations are identified and corresponding receipt elements are created.
- B. Material requirements planning (MRP) includes automatic capacity leveling.
- C. Long-term planning (LTP) is a long-term form of forecasting.
- D. Master production scheduling (MPS) refers to preferred planning of important materials.
Answer: D
NEW QUESTION 54
A material was planned in the context of SAP ECC material requirements planning. The MRP controller subsequently processed the material by manually converting a specific planned order into a production order.
The MRP controller now accesses the current stock/requirements list and the MRP list for this material and compares these two lists.
What do you have to consider for the two lists at this stage? (Choose two)
- A. The stock/requirements list was updated the moment it was accessed.
- B. The MRP list displays the production order.
- C. The stock/requirements list displays the production order.
- D. The MRP list has the status "processed".
Answer: A,C
NEW QUESTION 55
Which of the following properties applies to multi-site planning in SAP ECC?
- A. When using one-step stock transfer posting, transfer stock is created in the receiving plant.
- B. Both withdrawal from an alternative plant and stock transfer from another plant are defined via special procurement keys.
- C. The use of "scope of planning" is always mandatory for multi-site planning.
- D. Multi-site planning can be activated using the corresponding planning strategy.
Answer: B
NEW QUESTION 56
Which of the following statements about the planning functions available in SAP ECC is correct?
- A. In demand management (DM) material shortage situations are identified and corresponding receipt elements are created.
- B. Long-term planning (LTP) is a long-term form of forecast planning.
- C. Material requirements planning (MRP) includes automatic capacity leveling.
- D. Master production scheduling (MPS) refers to preferred planning of important materials.
Answer: D
NEW QUESTION 57
Which of the following structural elements does a process order have? (Choose three.)
- A. Parallel sequences
- B. Characteristic-based process instructions
- C. Relationships
- D. Phases
- E. Item data
Answer: B,C,D
NEW QUESTION 58
Which repetitive manufacturing options can you use to carry out line loading in the SAP ECC system, and thus generate run schedule quantities (RSQ) from normal planned orders? (Choose three)
- A. A planning algorithm from capacity planning
- B. Automatic selection of the production line assigned to the MRP group used during material requirements planning (MRP)
- C. Manual assignment of planned production quantities in a planning table
- D. Automatic selection of the production version in material requirements planning (MRP) using the selection methods setting
- E. Automatic selection of the production version by applying quota arrangement records in material requirements planning (MRP)
Answer: C,D,E
NEW QUESTION 59
You want to use the function "Read PP master data" in the production order.
However, while calling the function you receive an error message.
What could be the reason?
- A. The production order has been released.
- B. Order papers have been printed.
- C. The material availability check has been performed.
- D. Goods movements have been posted.
Answer: D
NEW QUESTION 60
Which functions can be triggered before releasing a production order? (Choose three)
- A. Selection of a BOM
- B. Confirmation
- C. Selection of a routing
- D. Stock determination
- E. Scheduling
Answer: A,C,E
NEW QUESTION 61
......
C-TSCM42-67 Exam Certification Details:
| Sample Questions: | SAP C-TSCM42-67 Exam Sample Question |
| Exam: | 80 questions |
| Level: | Associate |
| Duration: | 180 mins |
SAP C-TSCM42-67 Exam Description:
The certification "SAP Certified Application Associate - Production Planning & Manufacturing with SAP ERP 6.0 EHP7" verifies the knowledge in the area of Production for the consultant profile. This certificate proves that the candidate has a basic understanding within this consultant profile and can implement this knowledge practically in projects. The SAP Certified Application Associate can contribute to the success of the planning and implementation phases of the project in a mentored role and would typically have a maximum of three years experience in the solution area. Project experience should not be prerequisite for a competent and well trained candidate to pass this exam.