NEW QUESTION 69
According to Little's Law, which of the following statements is true if a team reduces its Work in Progress (WIP) limit? (choose the best two answers)

  • A. Average time between starting and finishing (cycle time) of Product Backlog items will likely decrease.
  • B. Value of each backlog item completed likely will go up.
  • C. Quality of work completed will likely increase.
  • D. In a given time period, the average number of Product Backlog items (throughput) completed will likely increase.

Answer: A,D

 

NEW QUESTION 70
Only a Product Owner and Developers are the needed when applying Kanban in Scrum.

  • A. TRUE
  • B. FALSE

Answer: B

 

NEW QUESTION 71
Reducing batch sizes might have the following impact: (choose all that apply)

  • A. Lower efficiency due to overhead/transaction costs in case the batch size is too small.
  • B. Highlight a need to improve processes/infrastructure to reduce the pain of frequent costly overhead.
  • C. Higher motivation due to seeing your work get done and deliver value earlier.
  • D. Improving efficiency due to faster feedback loops.

Answer: A,B,C,D

 

NEW QUESTION 72
The team needs to work on a high priority urgent unplanned item, but they are at their WIP limit.
True or False: They should change the WIP limit at their Daily Scrum to enable them to pull in that item.

  • A. TRUE
  • B. FALSE

Answer: B

 

NEW QUESTION 73
If new urgent work emerges during the Sprint, who must change the Work in Progress (WIP) Limits in the team's definition of "Workflow"? (choose the best answer)

  • A. The Product Owner.
  • B. The Developers.
  • C. Work in Progress (WIP) Limits cannot be changed during a Sprint.
  • D. No one. New urgent work is not a valid reason to change Work in Progress (WIP) Limits.
  • E. The Scrum Master.

Answer: D

 

NEW QUESTION 74
True or False: A result of having Work in Progress (WIP) limits is that it creates a pull system.

  • A. TRUE
  • B. FALSE

Answer: A

 

NEW QUESTION 75
What are the benefits of having early, frequent, and consistent feedback loops? (choose the best answer)

  • A. Identifying and addressing problems early.
  • B. All of the above.
  • C. Improved workflows.
  • D. Increased customer satisfaction.

Answer: B

 

NEW QUESTION 76
When using Kanban in Scrum, a team needs to use which of the following four metrics of flow? (choose the best four answers)

  • A. Throughput
  • B. Cycle Time
  • C. Work Item Age
  • D. Lead Time
  • E. Cumulative Flow Diagram (CFD)
  • F. Work in Progress (WIP)

Answer: A,B,C,F

 

NEW QUESTION 77
Which of the following metrics will likely be reviewed by at the Daily Scrum for a Scrum Team using Kanban? (choose the best two answers)

  • A. Work in Progress (WIP).
  • B. Work Age Item.
  • C. Throughput.
  • D. Velocity.
  • E. Cycle Time.
  • F. Lead Time.

Answer: A,B

 

NEW QUESTION 78
Which of the following practices is NOT included in Kanban for Scrum Teams? (choose the best answer)

  • A. Actively managing work in progress.
  • B. Inspecting and adapting the workflow.
  • C. Identifying bottlenecks and impediments.
  • D. Limiting Work in Progress (WIP).
  • E. Visualizing the workflow.

Answer: C

 

NEW QUESTION 79
Is the Scrum Master role needed for Scrum Teams using Kanban? (choose the best answer)

  • A. NO
  • B. IT DEPENDS
  • C. YES

Answer: C

 

NEW QUESTION 80
A Scrum Team, that is new to Kanban, asks for your advise on how to start with increasing predictability.
What would be the most appropriate response? (choose the best answer)

  • A. Teach them about Work in Progress (WIP) Limits and have them reduce the amount of work in progress.
  • B. Have the team create a CFD, Control Chart and Aging chart to improve transparency.
  • C. Ask the team to begin inspecting and adapting the Product Backlog during the Sprint Review.
  • D. Setup a Kanban board for them to visualize the workflow.

Answer: A

 

NEW QUESTION 81
True or False: Explicit policies applied at each state/column of the workflow can replace the need for a definition of "Done".

  • A. TRUE
  • B. FALSE

Answer: B

 

NEW QUESTION 82
Which two items would you expect to see in a service level expectation (SLE)? (choose the best two answers)

  • A. A cost of engineering
  • B. A probability
  • C. A period off elapsed day
  • D. A forecasted date

Answer: B,C

 

NEW QUESTION 83
True or False: Cycle time is considered a lagging indicator.

  • A. TRUE
  • B. FALSE

Answer: A

 

NEW QUESTION 84
......

Prepare for the Actual Professional Scrum with Kanban PSK-I Exam Practice Materials Collection: https://www.dumpsreview.com/PSK-I-exam-dumps-review.html