C_HANATEC_17 PDF Exam Material 2021 Realistic C_HANATEC_17 Dumps Questions [Q38-Q56]

Share

C_HANATEC_17 PDF Exam Material 2021 Realistic C_HANATEC_17 Dumps Questions 

Updated SAP C_HANATEC_17 Dumps – PDF & Online Engine

NEW QUESTION 38
Where do you investigate a failed uninstall of an SAP HANA scale-out system?

  • A. /hana/log/<SID>
  • B. /usr/sap//hostctrl/work
  • C. /hana/shared/log
  • D. /var/tmp/hdblcm.log

Answer: D

 

NEW QUESTION 39
What do you need in a Multitenant Database Container (MDC) system to run queries across tenant databases?
There are 2 correct answers to this question.

  • A. The user in the source system must have sufficient privileges in the target database
  • B. The cross-tenant database communication must be explicitly activate
  • C. The bidirectional communication channel must be whiteliste
  • D. The user in the source system must be associated with a user in the target database

Answer: A,B

 

NEW QUESTION 40
When can you load and unload individual tables and table columns manually in an SAP HANA tenant database? There are 2 correct answers to this question.

  • A. When you need to extend the scale-out memory
  • B. When you need to optimize the standby node memory.
  • C. When you need to actively free up memory.
  • D. When you need to measure total memory

Answer: C,D

 

NEW QUESTION 41
Which tools can you use to start and stop tenants in an SAP HANA database? Note: There are 2 correct answers.

  • A. sapcontrol
  • B. SAP HANA Studio - System view
  • C. hdbsql
  • D. SAP HANA cockpit 2.0 - Manage Databases

Answer: C,D

 

NEW QUESTION 42
Which tool do you use during the Database Migration Option (DMO) procedure to monitor table splitting?
Please choose the correct answer.

  • A. The Observer Monitor
  • B. The Log viewer
  • C. The Process Bucket monito
  • D. The R3LDCTL

Answer: B

 

NEW QUESTION 43
Which features are provided by the Manage Full System Information Dumps app in SAP HANA cockpit?
There are 2 correct answers to this question.

  • A. End-to-end Trace
  • B. Runtime environment
  • C. SAP HANA minichecks
  • D. Diagnosis information

Answer: B,D

 

NEW QUESTION 44
What software innovations did SAP deliver with SAP HANA? There are 2 correct answers to this question.

  • A. Row and Delta store.
  • B. Insert only on Column store.
  • C. Partitioning.
  • D. Compression and Decompression.

Answer: A,C

 

NEW QUESTION 45
What can you do to shorten the startup time of an SAP HANA system after a reboot?

  • A. Partition the row store across nodes.
  • B. Set the preload column value in the Tables system table to FULL.
  • C. Flag all columnar tables for preload.
  • D. Set the savepoint interval to a lower value.

Answer: D

 

NEW QUESTION 46
Which of the following database resources can be monitored at the DBA Cockpit Current Status Overview monitor?
There are 3 correct answers to this question.

  • A. Connection statistics about open connections.
  • B. Memory and CPU consumption from the SAP HANA database.
  • C. Disk consumption from the SAP HANA database.
  • D. The time at which the database was started.

Answer: B,C,D

 

NEW QUESTION 47
The data storage of your productive SAP HANA instance crashed, and you need to recover the database. The log storage is still intact. You have a full data backup that is 9 hours old and an incremental backup that is 4 hours old. To which point in time can you recover to minimize the data loss? Please choose the correct answer.

  • A. The latest log backup
  • B. The last full data backup
  • C. The last commited transaction
  • D. The latest incremental backup

Answer: C

 

NEW QUESTION 48
Which migration features are supported when using the Database Migration Option (DMO) feature of SAP Software Update Manager (SUM)? There are 2 correct answers to this question.

  • A. The source system is Application Server (AS) Java-base
  • B. The source and target database system are of the same type
  • C. The target database is SAP Adaptive Server Enterprise (ASE)
  • D. The Primary Application Server can be moved to a target system Landscape

Answer: C,D

 

NEW QUESTION 49
What is the minimum space requirement for the Data Volume? There are 2 correct answers to this question.

  • A. 3 * RAM (Appliance)
  • B. 1.2 * RAM (TDI)
  • C. Min. 0.5 * RAM
  • D. Min. 1 * RAM

Answer: A,B

 

NEW QUESTION 50
Which prerequisites of the primary system and the secondary system are mandatory before you can activate the SAP HANA system replication with the read-enabled mode? Note: There are 2 correct answers.

  • A. Both must have the same SAP HANA version
  • B. An explicit read-only connection between both systems must be available
  • C. The same number of active hosts and standby hosts must be installed
  • D. The CPU architecture must be identical

Answer: A,B

 

NEW QUESTION 51
Which application do you use to reset the memory statistics before you analyze a tenant database using SAP HANA cockpit?

  • A. Manage Databases
  • B. Performance Monitor
  • C. Resource Directory
  • D. Manage Services

Answer: D

 

NEW QUESTION 52
What additional action do you need to perform after you created a new tenant in an SAP HANA system replication configuration? Please choose the correct answer.

  • A. Start tenant database.
  • B. Restart secondary system.
  • C. Back up tenant database
  • D. Copy tenant database.

Answer: C

 

NEW QUESTION 53
How are savepoints triggered? There are 2 correct answers to this question

  • A. By performing a delta merge.
  • B. By a database soft shutdown.
  • C. By performing a database backup.
  • D. By issuing a transactional commit.

Answer: B,C

 

NEW QUESTION 54
Which tasks can you perform using the SAP HANA database lifecycle manager (HDBLCM) on installation media? There are 2 correct answers to this question.

  • A. Uninstall SAP HANA database components.
  • B. Extract components.
  • C. Update SAP HANA and its components.
  • D. Rename the SAP HANA database system.

Answer: B,C

 

NEW QUESTION 55
Which removal statuses allow you to remove a host from an SAP HANA scale-out landscape Note: There are
2 correct answers.

  • A. Reorg not required
  • B. Reorg pending
  • C. Reorg active
  • D. Reorg finished

Answer: A,D

 

NEW QUESTION 56
......


SAP HANATEC 17 Certification Exam Details:

Number of Questions80
Passing ScoreC_HANATEC_17 - 61%
Exam CodeC_HANATEC_17
LevelAssociate
Exam Price$550 (USD)
Schedule ExamSAP Training

 

SAP C_HANATEC_17 Dumps PDF Are going to be The Best Score: https://www.dumpsreview.com/C_HANATEC_17-exam-dumps-review.html